Tag Archives: CITY COUNCIL

AND EVEN MORE AGONY, ANGUISH AND DEALINGS WITH THE CITY, PART 3

August 18, 2017

Checks and balances (photo from lawyersites.net)

(Continuing on my rants from previous posts on agency agony, here and here.

I respect the city process where my designs are reviewed and approved for construction. In theory, this process can offer productive checks-and-balances. But since this is so rare these days, my idealism is often extinguished.

Measuring Lego-style (photo from saber-scorpion.com)
Measuring Lego-style (photo from saber-scorpion.com)

True story. The planning code for some new homes by Poon Design was unclear. We went to the top, asking the Planning Director for clarification on the required length of the driveways. The boss stated the driveways are to be 15 feet long. Seemed clear enough, right?

Since agencies are notorious for being noncommittal, forgetful and/or contradictory, we requested that the Director’s ruling be provided to us in writing. Receiving the black and white document, we proceeded (safely we thought) with this simple criterion of 15-foot long driveways.

With all the homes approved by the city’s numerous departments, construction commenced. The homes were completed beautifully, and later, furnished, styled, landscaped. Families moved in.

S/B House, Encino, California, by Poon Design (photo by Poon Design)
S/B House, Encino, California, by Poon Design (photo by Poon Design)

Then the inexplicable and implausible occurred. The Planning Director changed his mind.

He now wanted driveways to be 20 feet long, not the aforementioned 15 feet.

How long is an automobile? (photo by Anthony Poon)
How long is an automobile? (photo by Anthony Poon)

We said okay: We will revise the designs for the future homes to come. But here is where it becomes unfathomable.

This Director demanded the driveways of the recently completed homes be extended. As you can guess, such a change would be physically impossible, since one cannot simply push an entirely built home back five feet, nor can one extend the driveway into the street.

A typical dreaded public hearing (photo by Colin McEvoy, Express-Times) Image of public hearing
A typical dreaded public hearing (photo by Colin McEvoy, Express-Times)

Our request for relief was brought to the Planning Department and the City Council. Though the decision makers went on public record, broadcasted on television, and admitted the change for the driveway length was puzzling, and though the Council said it was ludicrous, they supported and upheld the Director’s change. The financial damage of this whimsical, unprofessional and even unethical decision would cost millions of dollars, in addition to making families homeless.

After many months, after several dozen meetings, after hundreds of phone calls and emails, and after the threat of a lawsuit against the city for negligence, the city officials allowed the completed homes to remain as they were.

Concepts for housing development, California, by Poon Design (rendering by Amaya)
Concepts for housing development, California, by Poon Design (rendering by Amaya)

EPILOGUE: For nearly every architectural project of my colleagues and mine, these bewildering challenges have seized us, in one form or another. There is no escape.

HERMOSA BEACH FIASCO: ARCHITECTURE OF POLITICS

March 25, 2016

Suspended steel and wood fishing platforms offer a unique experience above the ocean, under the existing concrete pier, Hermosa Beach, California, by Lombardi/Poon Architects

My first public commission—I learned how difficult life as an architect would be. A decade-long saga of city politics, professional contradictions, and the theft of my intellectual property taught me to fight.

My design partner, the late Greg Lombardi was 30. I was 29. Calling ourselves Lombardi/Poon Architects, our shingle was barely even hung when we entered an international design competition organized by The American Institute of Architects (“AIA”). The city of Hermosa Beach sought an architect with a vision for the redesign of their waterfront and pier.

In contrast to the proposals for hotels, shopping malls and amusement parks, our design was simply a graceful open space that gathered together the city, beach, ocean, sun and horizon.

Greg Lombardi and me, first of hundreds of local and national articles, Daily Breeze, 1993
Greg Lombardi and me, first of hundreds of local and national articles, Daily Breeze, 1993

It was a miracle. Lombardi/Poon Architects won! We beat out everybody—competitors from around the world, architects twice and thrice our senior.

But this was just the start of a staggering journey, a trial by fire.

After the celebration presenting Greg and me to national media outlets, before we got to bask in my triumph, the city council of Hermosa Beach stripped us of our win. The council proclaimed that they themselves should choose the winner, not the AIA. That the city’s public dollars were being spent, it seemed logical that the council should have a say in the winner.

It was a devastating blow. How would we win a second time? The council members were politicians from various business backgrounds—not architects of the AIA. The original competition was reviewed by experts who were qualified to assess abstract design concepts and read technical drawings.

In the end, Lombardi/Poon swooped up my second miracle, against hundreds of competitors. We won, again! We shook hands all over again, stood for press conferences again.

But.

Development of our design could not start. The citizens of Hermosa Beach rumbled—wanted their vote for the winning architect. Understandable, it’s their waterfront and pier. Our design was to go before a public vote by the town.

Public plaza sloping down to the beach and up to the horizon, with renovated lifeguard tower, palm trees in an elliptical arc, bike path, and ribbon-like metal canopy
Public plaza sloping down to the beach and up to the horizon, with renovated lifeguard tower, palm trees in an elliptical arc, bike path, and ribbon-like metal canopy

Stripped once again of the win, I now witnessed my future: the ups and downs of a rollercoaster journey to come. The destiny of the project moved down the line from a professional AIA jury, to a layperson group of elected officials, to now, people who were even further from understanding architectural drawings.

A third miracle. Lombardi/Poon won once again! The people of Hermosa selected us as the architect, one year since our initial victory.

However.

With how state funds are to be spent, Hermosa had to validate their fiscal responsibility. Legislative requirements forced Hermosa to invite any and all architects to interview for the job—for our job that Greg and I already won several times—on which we were already working.

We now had to interview against senior companies, and the city council’s job was to look at credentials, not creativity. I could feel that the outcome would swing to a firm who, on paper, would be more qualified to develop our project.

I had to fight for my opportunity as I would have to again and again over the long architectural haul of a career. My plan? Engage a structural engineer who had such depth of experience that he would make my inexperience go unnoticed.

Public space, new palm trees, pier canopy, and optional glass skin for renovated lifeguard tower to reflect the water, sky and sun (watercolor by Al Forster)
Public space, new palm trees, pier canopy, and optional glass skin for renovated lifeguard tower to reflect the water, sky and sun (watercolor by Al Forster)

This idea failed horribly. During the public interviews, my saving grace of retaining an engineer of age and gravitas proved to be my worst mistake.

He took to the microphone, presented himself, stating in his best salesperson-like booming voice: “We are so excited to be considered by HUNTINGTON Beach.”

Greg and I cringed. Hermosa Beach, you idiot!

This was akin to a rock band thanking Milwaukee, when they were on stage in Cleveland. Like shouting “Go USC” at a UCLA game. Calling your spouse by the wrong name. You get the drift.

Our misguided engineer continued, live on television: “We would love to work with Huntington Beach. Huntington Beach would do so well to have our skills.” Huntington this and that.

No surprise, Lombardi/Poon Architects loss the project that we created and won several times over.

And it got worse.

New fishing platforms and ribbon-like metal pier canopy
New fishing platforms and ribbon-like metal pier canopy

A large corporate company from Irvine won the contract to develop Greg and my project. And in an unethical turn of events, this company sought to steal our design and credit its creation as their own. I received a letter that had a legal tone to it. The company’s founding partner declared that the Hermosa Beach project now belonged to him. Furthermore, he asserted that he might mention our names in the future, “if he so desired and at his convenience.”

This arrogant asshole was steamrolling over us, two fresh young architects two years into their first public commission. The senior architect’s malicious actions constituted theft—shoplifting of Lombardi/Poon’s intellectual property.

Master plan for waterfront and pier
Master plan for waterfront and pier

I took the first step of a ritual that so many adults do through out their life: I called a lawyer. It would be my first time, but not my last. Unfortunately, my attorney assessed that this Irvine architect could legally do everything he claimed.

I decided to visit face-to-face with this self-important jerk of an architect. Presenting the recognition from Hermosa Beach, the hundreds of articles crediting Greg and me, and our recent AIA design award for this project, I made clear his unethical actions. I don’t know if he felt guilty, or if he no longer cared, or maybe he was impressed with my tenacity. He apologized for his nasty letter.

Year three: here is where the end begins. The project loss its funding, due to the political delays. Only the first phase of our vision was developed and completed. By me.

Lifeguard tower renovated to bring in maximum natural light and ocean breezes, as well as allow views and access to the beach for safety
Lifeguard tower renovated to bring in maximum natural light and ocean breezes, as well as allow views and access to the beach for safety

EPILOGUE: I ran into the horrible founding partner ten years later. Of course, he did not recognize me. I re-introduced myself, and his posture displayed embarrassment. Looking worn and exhausted, he appeared as if architecture defeated him. For this little man, I had no feeling one way or another.

As I drove home that afternoon, west towards the ocean, I acknowledged my ambition and resolve. And I buckled my seat belt for more challenges to come in this career of lunacy called Architecture.

© Poon Design Inc.